New Construction Glen Avenue Parking Structure New construction Electrical Engineering and Computer Science Original building Business Administration Executive Dorm New construction A. Alfred Taubman Health Care Center Original building The University Hospital Original building Institute of Continuing Legal Education New construction Medical Science Research Building I New construction Medical Center Drive Parking Structure construction Donald B. Canham Natatorium New construction Dow-G.G. Brown Connector construction Medical Science Research Building II New construction William R. Murchie Science Building (Flint ) New construction Glenn E. Schembechler Hall Construct new room N. Campus Housing Community Center New construction The University Hospital Medical Procedures Unit University Hospitals Child Care Center construction Francois-Xavier Bagnoud Building New construction Medical Sciences Research Building III New Construction Dearborn Campus Support Services Facility New construction Frances Willson Thompson Library New construction Harrison M. Randall Laboratory Addition School of Social Work Building New construction Cancer and Geriatrics Centers Facility New construction Med Center N. Entrance Parking Structure University Hospital Integrated Technology Instruction Center New construction Lurie Engineering Center New construction Lurie (North Campus) Bell Tower New construction Tennis Center Contruction of new tennis facility Dearborn Campus Campus renovations - Phase II Primary Care Facility Phase 1 - East Campus Total New Construction $766,553,571 Major Renovations Kresge Medical Research Unit III Addition #2 Tappan Hall Library Michigan Union Improvements phase I and II Earl W. Moore Building New addition Multiple Buildings 1984-85 program Herbert H. Dow Building Media center renovations Computing Center Addition 1 Central Heating Plant Boiler/generator, gas turbine Lorch Hall Renovation and relocations West Engineering Information/Library Studies Buhr Building Library storage Institute for Social Research Addition II Michigan League 1st floor kitchen/cafeteria Catherine Street Parking Structure 1987 deck repairs Engineering I Optics lab G.G. Brown Laboratory Chiller addition Art and Architecture Building Renovate external wall enclosure Central Heating Plant New boiler breeching system Medical Center Land Improvements Chiller replacement and water loop Church Street Parking Structure Public safety and communications North University Tunnel New construction Chemical Stores Warehouse addition William D. Revelli Band Rehearsal Hall Addition Central Heating Plant New boiler breeching system Horace H. Rackham Graduate Studies Chiller and cooling tower Angell Hall-Mason Hall Courtyard computer facility C. C. Little Science Building Remodel rooms for isotope lab Samuel Trask Dana Building Renovate portion of ground level The University Hospital Fourth chiller David M. Dennison Building Central chiller plant Chemistry Building Remodel 4th floor, addition 4 Chemistry W.H. Dow Laboratory Medical Science Unit II Anatomy department renovations Administrative Services HVAC renovations Medical Science Unit I Remodel 4th floor west wing Edward Henry Kraus Building Renovate old structure Fletcher Street Parking Structure 1990 deck repairs The 300 N. Ingalls Building Renovate 9th floor wet/laser labs Edward Henry Kraus Building Auditorium renovations Football Stadium Concrete repairs - 1991, 1992 Harrison M. Randall Laboratory New mechanical penthouse/core Medical Science Unit I Chiller system replacement Medical Science Unit I Remodel C and D wings Space Research Laboratory Addition - east side Pharmacy College C.C. Little addition lab-bridge Maternal and Child Health Care Center Renovate rooms N. Campus Commons and Dow Engineering CAEN classrooms and library Harrison M. Randall Laboratory North stair and wing renovation Harrison M. Randall Laboratory Remodel 3rd floor Glenn E. Schembechler Hall Margaret Dow Towsley Museums Dental Building and W.K. Kellogg Institute Renovate rooms C. C. Little Science Building Facilities grant project North Campus Service Building #1 Remodel for waste transfer facility Central Heating Plant Boiler #5 CCRB and Bell Pool Three discussion classrooms Henry S. Frieze Building 4th floor office and classroom Kresge Medical Research Unit III Remodel 4th floor for wet labs Football Stadium Prescription turf Kellogg Eye Center and Turner Clinic Renovate rooms Yost Ice Arena Renovations phase I 1239 Kipke Drive Renovations - structural floor Thayer Street Parking Structure 1992 restoration Dental Building and W.K. Kellogg Institute Chiller Replacement Chemistry Building Renovate lecture halls, structures Mary B. Markey Hall Facility renewal, replace windows Wolverine Tower Renovate 1st, 2nd floors for DRDA Harrison M. Randall Laboratory Sub-basements 1st, 2nd floors Athletics Administration Phase I and II buillding renovation Medical Science Unit I Remodel levels 4 and 5 Medical Science Research Building I Replace corroded water pipes 1239 Kipke Drive Renovate mechanical rooms South Quadrangle Renovation of E and W elevators Medical Science Unit I New electrical substation Flint Central Energy Plant Expand utility distrlbution system Harrison M. Randall Laboratory Stair bay/basement/4th floor Golf Clubhouse Remodel public areas 1239 Kipke Drive Communication system 1239 Kipke Drive New public safety facility Golf Course Improvements Dental, Neuroscience, N. University, Moore, and Naval Architecture & Marine Engineering Cooling tower replacements Wolverine Tower Renovations phase I, II Samuel Trask Dana Building Remodel 3rd floor Medical Science Unit I Remodel auditorium A wing Central Heating Plant Transformer and 40 KV feed North Campus Switch Station (Edison) Increase electrical capacity South Quadrangle Window replacement project Football Stadium Repair programs 1994, 1995 Alexander G. Ruthven Museums Building Renovations - herpetology, insects Church Street Parking Structure Repairs 1993,1994 Church Street Parking Structure 1994 repairs C.S. Mott ChildrenŐs Hospital Renewal The University Hospital Relocation-diagnostic vascular unit G.G. Brown Laboratory Manifold fumehood exhaust Alexander G. Ruthven Museums Building Replace chiller and pump Dental Building and W.K. Kellogg Institute Remodel for research labs Shapiro Undergraduate Library Additions and renovations Medical Science Unit II Upgrade air handling system South Quadrangle Renovate 9th and ground floor Medical Science Units I and II Air quality improvements Medical Science Unit I Remodel 6th level A-wing Newberry Hall - Kelsey Museum Sensitive artifact facility Fletcher Street Parking Structure Install new fire protection system Medical Science Unit I Chiller - clinical pathology labs Chemistry Building Manifold fume hood exhaust Medical Science Unit II Micro/Immun laboratory/office School of Education Remodel part of 3rd floor David M. Dennison Building Absorption chiller, cooling system Medical Science Unit II Remodel lecture halls 1239 Kipke Drive Campus safety and security Angell Hall Addition - Mason Hall 3rd floor classrooms phase II Edward Henry Kraus Building Library for classrooms East Engineering Building renovation James B. Angell Hall Building renovation C. C. Little Science Building Building Renovation Student Activities Building Visitors Center addition Thompson Street Parking Structure 1995 restoration James B. Angell Hall Haven Hall connector C.S. Mott ChildrenŐs Hospital Single room maternity care Cook Legal Research Library Jackier rare book room University Hospital Human Application Lab renovation IST Laboratory Wing Remodel west basement area Cook Legal Research Library Replace piping C.C. Little Science Building College of Pharmacy - Phase II East Engineering Exterior window replacement C.C. Little Science Building Renovate 1st floor east wing Medical Science Unit I Remodel 6th and 7th level A wings Wolverine Tower Parking lot reconstruction Cook Legal Research Library Stair addition Football Stadium 1995 repairs - phase I and II Dennison Building Renovate 2nd floor classrooms Student Activities Building Replace chiller and cooling tower Cook Legal Research Library Fire safety project - sprinklers Michigan Union Renovations Michigan League Renovations Pierpont (North Campus) Commons Building renewal 1995 Health Service Additions and renovations School of Education Replace windows Wolverine Tower Remodel floors 3,5,and 6 Wolverine Tower Renovate floors 8 and 9 Multiple Locations Underground tank removal Multiple Buildings Campus card access system School of Public Health I and II Central chiller plant Land Improvements - Ferry Field Develop south area Land Improvements Security lighting improvements Hatcher Graduate Library - multiple buildings Roof replacement Land Improvements - West Central Cempus Duct run Engineering Center/Beal Ave Land improvements Land Improvements - North Campus Road and parking reconstruction Walter E. Lay Automotive Lab Tank farm and storage building Health Service, Dental, Kellogg Central chiller plant Total Renovations Buget: $1,234,543,989