Environmental and Economic Life Cycle Assessment of Alternative Sources of Water at Bell Brewery

dc.contributor.authorEngel, Alexander
dc.contributor.authorGoodspeed, Peter
dc.contributor.authorMonti, Christopher
dc.contributor.authorShiledar, Samhita
dc.contributor.advisorMiller, Shelie
dc.date.accessioned2017-04-25T17:34:51Z
dc.date.availableNO_RESTRICTIONen_US
dc.date.available2017-04-25T17:34:51Z
dc.date.issued2017
dc.date.submitted2017-04
dc.identifier303en_US
dc.identifier.urihttps://hdl.handle.net/2027.42/136608
dc.description.abstractBell's Brewery, Inc. is a craft beer brewer based out of Kalamazoo, Michigan. Bell’s gives high priority to sustainability and has undertaken numerous initiatives within the company to reduce energy usage as well as water consumption. Water is one of the most important components of the brewing process. One gallon of beer production requires five gallons of water. The company’s current annual production of 9.6 million gallons of beer requires 150,000 gallons of water per day. Bell’s projects their water consumption will increase to 500,000 gallons per day within the next five years. Bell’s currently sources water from the Kalamazoo Water Division. Considering the company’s forecasted growth, their current infrastructure only supports their water treatment requirements for the next two years. In addition, the risk of source water contamination has led Bell’s to consider alternative sources to meet the quantity and quality of water required for the brewing process. The team identified and analyzed the following four alternative sources: 1. Continue sourcing water from the Kalamazoo Water Division 2. Drill an on-site water well 3. Source water from Portage 4. Source water from Battle Creek We determined different life stages involved in these four different options and performed lifecycle analysis and financial analysis to analyze the environmental, financial, human health, and social impacts of each option. Based on our analysis, the well option has the lowest human health impact, ecological impact and global warming potential. The chief reason is that in the well option, water is being pumped the shortest distance which uses the least energy. The adjacent municipality options are the least appealing from an environmental perspective. The combination of the impacts of the municipal water system, the energy to pump water from that adjacent municipality, and the significant infrastructure needed renders these options hard to justify. The four options were also evaluated by their total cost. Extensive information was gathered through interviews with well digging professionals and county officials in addition to secondary research of publicly available information. This allowed the project team to develop comprehensive financial models and equivalent annual costs for each potential option. Based on the models developed, it was discovered that digging a well would be the most affordable option for its assumed lifespan.Given the results for each option, the team developed a scorecard, which consisted of five factors. Each factor was weighted based on what the team believed would be the preferences of Bell’s Brewery. The weighted results, shown below, allowed the team to compare the total effects of each option. In the end, it was determined that the construction of an on-site well would be the best option due to its relatively small environmental impact and low cost.Because of these results, the team developed a wellhead management plan, which would help Bell’s further reduce its impact on the local water table. To isolate the wellfield from the existing surface and underground infrastructure, a recommended 150’ was established around all of the buildings on the property. The placement of the wellfield was determined by an optimization program with the recommended location of 42.28347144° N, -85.45125228° W to mitigate nearby stream drawdown, which may otherwise promote litigation. An additional measure to legally insulate the company is the pursuit of a social license to operate before installing a wellfield on-site. This would require engaging the local community, explaining the company’s environmental initiatives, and involving community members in the planning of the wellfield.en_US
dc.language.isoen_USen_US
dc.subjectsustainabilityen_US
dc.subjectfinancial assessmenten_US
dc.subjectlife cycle assessmenten_US
dc.titleEnvironmental and Economic Life Cycle Assessment of Alternative Sources of Water at Bell Breweryen_US
dc.typeProjecten_US
dc.description.thesisdegreenameMaster of Science (MS)en_US
dc.description.thesisdegreedisciplineNatural Resources and Environmenten_US
dc.description.thesisdegreegrantorUniversity of Michiganen_US
dc.contributor.committeememberArvai, Joseph
dc.identifier.uniqnamearengelen_US
dc.identifier.uniqnamegoodpjen_US
dc.identifier.uniqnamecmontien_US
dc.identifier.uniqnamesamhitaen_US
dc.description.bitstreamurlhttps://deepblue.lib.umich.edu/bitstream/2027.42/136608/1/303_Bell's Brewery.pdf
dc.owningcollnameDissertations and Theses (Ph.D. and Master's)


Files in this item

Show simple item record

Remediation of Harmful Language

The University of Michigan Library aims to describe library materials in a way that respects the people and communities who create, use, and are represented in our collections. Report harmful or offensive language in catalog records, finding aids, or elsewhere in our collections anonymously through our metadata feedback form. More information at Remediation of Harmful Language.

Accessibility

If you are unable to use this file in its current format, please select the Contact Us link and we can modify it to make it more accessible to you.