dc.contributor.author | Construction Innovation Forum | |
dc.coverage.temporal | 1995 | |
dc.date.accessioned | 2014-08-08T14:06:25Z | |
dc.date.available | 2014-08-08T14:06:25Z | |
dc.date.created | 2014 | |
dc.date.issued | 2014 | |
dc.identifier.other | 9934_0001_0004 | |
dc.identifier.uri | https://hdl.handle.net/2027.42/108120 | |
dc.description.abstract | Award Manager's Summary reports for 1995. Reports include an overview and background of the innovation, its application, notes on interviews, and other information related to the evaluation of the innovation. Innovations assessed: Paveset Computerized Height Control for Paving Machines, Bird Island Flats Tunnel Roof Casting Machines, Intralock Concrete Block System, Hydro-Hog sewer sediment cleaning, 21 Foot Diameter Interior Pipe Joint Tester, Humidification Retrofit, Integrated Real-time Position Measurement and 3D-CAD | en_US |
dc.language.iso | en_US | en_US |
dc.title | NOVA Award - 1995 Investigation - Award Manager's Summary reports, 1995 | en_US |
dc.type | Other | en_US |
dc.contributor.affiliationumcampus | Ann Arbor | en_US |
dc.description.bitstreamurl | http://deepblue.lib.umich.edu/bitstream/2027.42/108120/1/Investigation1995.zip | |
dc.description.mapping | -1 | en_US |
dc.rights.access | Content is open for research | |
dc.rights.copyright | Donor(s) have transferred any applicable copyright to the Regents of the University of Michigan but the collection may contain third-party materials for which copyright was not transferred. Patrons are responsible for determining the appropriate use or reuse of materials. | en_US |
dc.owningcollname | Construction Innovation Forum Records | |