Control of an Assembly System with Processing Time and Subassembly-Type Uncertainty
dc.contributor.author | Keblis, Matthew F. | en_US |
dc.contributor.author | Duenyas, Izak | en_US |
dc.date.accessioned | 2006-09-11T16:06:10Z | |
dc.date.available | 2006-09-11T16:06:10Z | |
dc.date.issued | 1999-10 | en_US |
dc.identifier.citation | Keblis, Matthew F.; Duenyas, Izak; (1999). "Control of an Assembly System with Processing Time and Subassembly-Type Uncertainty." International Journal of Flexible Manufacturing Systems 11(4): 353-370. <http://hdl.handle.net/2027.42/45474> | en_US |
dc.identifier.issn | 0920-6299 | en_US |
dc.identifier.issn | 1572-9370 | en_US |
dc.identifier.uri | https://hdl.handle.net/2027.42/45474 | |
dc.description.abstract | We address the problem of controlling an assembly system in which the processing times as well as the types of subassemblies are stochastic. The quality (or performance) of the final part depends on the characteristics of the subassemblies to be assembled, which are not constant. Furthermore, the processing time of a subassembly is random. We analyze the trade-off between the increase in the potential value of parts gained by delaying the assembly operation and the inventory costs caused by this delay. We also consider the effects of processing time uncertainty. Our problem is motivated by the assembly of passive and active plates in flat panel display manufacturing. We formulate the optimal control problem as a Markov decision process. However, the optimal policy is very complex, and we therefore develop simple heuristic policies. We report the results of a simulation study that tests the performance of our heuristics. The computational results indicate that the heuristics are effective for a wide variety of cases. | en_US |
dc.format.extent | 81658 bytes | |
dc.format.extent | 3115 bytes | |
dc.format.mimetype | application/pdf | |
dc.format.mimetype | text/plain | |
dc.language.iso | en_US | |
dc.publisher | Kluwer Academic Publishers; Springer Science+Business Media | en_US |
dc.subject.other | Engineering | en_US |
dc.subject.other | Manufacturing, Machines, Tools | en_US |
dc.subject.other | Operation Research/Decision Theory | en_US |
dc.subject.other | Production/Logistics | en_US |
dc.subject.other | Mating | en_US |
dc.subject.other | Electronics Manufacturing | en_US |
dc.subject.other | Assembly | en_US |
dc.subject.other | Queueing Control | en_US |
dc.title | Control of an Assembly System with Processing Time and Subassembly-Type Uncertainty | en_US |
dc.type | Article | en_US |
dc.subject.hlbsecondlevel | Economics | en_US |
dc.subject.hlbtoplevel | Business | en_US |
dc.description.peerreviewed | Peer Reviewed | en_US |
dc.contributor.affiliationum | Department of Industrial and Operations Engineering, University of Michigan, Ann Arbor | en_US |
dc.contributor.affiliationum | School of Business Administration, The university of Michigan, Ann Arbor | en_US |
dc.contributor.affiliationumcampus | Ann Arbor | en_US |
dc.description.bitstreamurl | http://deepblue.lib.umich.edu/bitstream/2027.42/45474/1/10696_2004_Article_238699.pdf | en_US |
dc.identifier.doi | http://dx.doi.org/10.1023/A:1008179129543 | en_US |
dc.identifier.source | International Journal of Flexible Manufacturing Systems | en_US |
dc.owningcollname | Interdisciplinary and Peer-Reviewed |
Files in this item
Remediation of Harmful Language
The University of Michigan Library aims to describe library materials in a way that respects the people and communities who create, use, and are represented in our collections. Report harmful or offensive language in catalog records, finding aids, or elsewhere in our collections anonymously through our metadata feedback form. More information at Remediation of Harmful Language.
Accessibility
If you are unable to use this file in its current format, please select the Contact Us link and we can modify it to make it more accessible to you.